Metaltechnik AD has signed a contract with the Ministry of Labour and Social Policy
BG05SFPR002-1.004-0792-С01 for the implementation of the project “Adaptation of Workplaces at METALTECHNIK AD” under the Human Resources Development Programme 2021–2027.
The main goal of the project is to adapt the work environment in the company to the changing work models and in line with the transition to a climate-neutral economy.
Specific objectives include:
-
Encouraging the adaptation of METALTECHNIK AD employees to changing work models;
-
Further development of a healthy and well-adapted work environment through the enhancement of collective protective measures and social benefits.
The objectives will be achieved through:
-
Development and implementation of “green” work organization models tailored to the specific characteristics of the workplaces in the company;
-
Provision of collective protective equipment to improve working conditions and protection from hazardous radiation by installing protective welding screens at 20 workstations;
-
Provision of social benefits for employees by furnishing a designated dining area and renovating and equipping changing rooms.
As a result of the project implementation, the following will be achieved:
-
Introduction of new “green” models for work process organization and human resource management;
-
Workstations equipped with movable protective welding screens with shielding for 26 positions;
-
Furnished and operational dining room;
-
Renovated and furnished two changing rooms.
The total project value is BGN 240,483.21, with the EU providing a grant of BGN 204,410.73.
22 thoughts on “Project “Adaptation of Workplaces at METALTECHNIK AD” under the Human Resources Development Programme 2021–2027”
Comments are closed.